亚洲av高清一区三区三区,日韩精品人妻无码久久久,伊人网在线视频观看91,国产不卡的丝袜综合在线

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當(dāng)前位置:

首頁 News Industry information

Solution to lack of glue in plastic shell

Release time:2023-11-29

Lack of glue, also known as insufficient filling, is one of the common problems in the process of injection molding. The injection molding part is not full, and the existing bubbles, cavities, shrinkage holes, etc. are inconsistent with the standard template, which is called lack of glue. So how to solve itPlastic shellWhat about the lack of glue?

圖片2.png


The following are the reasons for the lack of glue in the plastic shell and its improvement measures:


① Mold: a. the design of the gating system is unreasonable. The gating system is the channel for the melt to enter the mold cavity, which has a great impact on the molding quality of the plastic parts. The gate is not parallel and the gate is not located at the wall thickness; b. The exhaust structure of the mold is poor; c. Impurities or cold materials in the melt block the flow channel; d. Mold temperature does not meet the requirements. Improvement measures: improve the pouring system, increase the exhaust of the mold, remove the impurities of the compound, and increase the mold temperature.


② Raw materials: a. the water content of raw materials is too large; b. Volatile substances in raw materials exceed the standard; c. There are too many impurities or recycled materials in the raw materials. Improvement measures: barbecue raw materials and increase raw materials.


③ Injection molding machine: A. insufficient injection quantity: for example, 180t products are produced by 150t machines. b. The nozzle is blocked by foreign matters and the nozzle hole is too small; c. Insufficient supply of raw materials: if the barrel is blocked, the nozzle material will affect the blanking; d. Check valve failure; e. Insufficient injection stroke. Improvement measures: increase the injection volume and increase the injection stroke.


④ Molding operation: A. mold temperature is too low; b. The injection pressure is too low; c. The pressure holding time is too short; d. The injection speed is too slow; e. The melt temperature is too low. Improvement measures: increase the mold temperature, increase the injection pressure, maintain the pressure time, and improve the injection speed.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
亚洲喷奶水中文字幕电影| 久久久久色国产精品一区| 欧美日韩国产这里只有精品| 欧美 亚洲 精品 三区| 国产一区二区三区av电影| 精品亚洲综合在线第一区| 亚洲色婷婷六月亚洲婷婷6月| 艳鉧动漫1~6全集在线观看| 国产紧身裤一区二区三区| 亚洲精品中文字幕星奈爱| 亚洲国产午夜精品一区二区| 嗯嗯嗯!用力插在线视频| 伊人久久精品欧洲综合网| 色呦呦精品一区二区三区| 国产对白91色拍高清精品| 熟女中文字幕一区二区三区| 思99思思久久最新精品| 亚洲蜜桃麻豆成人av在| 国产亚洲品久久久久久久| 欧美酷刑sm在线播放| 国产精品毛片a v视频| 久久婷婷五月综合色精品| 国产亚洲欧美综合在线区| 国产一区二区三区bb片| 亚洲成人精品久久一区二区| 无套熟女av呻吟在线观看| 日韩 欧美p片内射久久| 色狠狠久久av综合激情| a国产在线观看| 朋友的丰满人妻在线观看| 国产亚洲精99品精99| 1313精品午夜理伦电影| 大鸡巴猛插小穴在线观看| 国产午夜性生活免费视频| 精品久久洲久久久护士免费| 精品少妇av一区二区三区| 免费a级毛片无码免费视| 久久热精品一区二区三区| 国产精品无码久久久免费| 久久久无码人妻精品系列| 亚洲一区在线幕精品一区|