亚洲av高清一区三区三区,日韩精品人妻无码久久久,伊人网在线视频观看91,国产不卡的丝袜综合在线

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當(dāng)前位置:

首頁 News Industry information

Solution to lack of glue in plastic shell

Release time:2023-11-29

Lack of glue, also known as insufficient filling, is one of the common problems in the process of injection molding. The injection molding part is not full, and the existing bubbles, cavities, shrinkage holes, etc. are inconsistent with the standard template, which is called lack of glue. So how to solve itPlastic shellWhat about the lack of glue?

圖片2.png


The following are the reasons for the lack of glue in the plastic shell and its improvement measures:


① Mold: a. the design of the gating system is unreasonable. The gating system is the channel for the melt to enter the mold cavity, which has a great impact on the molding quality of the plastic parts. The gate is not parallel and the gate is not located at the wall thickness; b. The exhaust structure of the mold is poor; c. Impurities or cold materials in the melt block the flow channel; d. Mold temperature does not meet the requirements. Improvement measures: improve the pouring system, increase the exhaust of the mold, remove the impurities of the compound, and increase the mold temperature.


② Raw materials: a. the water content of raw materials is too large; b. Volatile substances in raw materials exceed the standard; c. There are too many impurities or recycled materials in the raw materials. Improvement measures: barbecue raw materials and increase raw materials.


③ Injection molding machine: A. insufficient injection quantity: for example, 180t products are produced by 150t machines. b. The nozzle is blocked by foreign matters and the nozzle hole is too small; c. Insufficient supply of raw materials: if the barrel is blocked, the nozzle material will affect the blanking; d. Check valve failure; e. Insufficient injection stroke. Improvement measures: increase the injection volume and increase the injection stroke.


④ Molding operation: A. mold temperature is too low; b. The injection pressure is too low; c. The pressure holding time is too short; d. The injection speed is too slow; e. The melt temperature is too low. Improvement measures: increase the mold temperature, increase the injection pressure, maintain the pressure time, and improve the injection speed.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
91精品久久久久久综合五| 亚洲AV无码?在线播放| 国产成人高清综合在线。| 无码精品av久久久奶水| 一区二区三区欧美日韩精品| 色哟哟精品视频一区二区| 精品久久久无码人妻字幂| 国产精品xxxx国产喷水| 国产三级视频在线免费观看| 久久精品亚洲一区亚洲二区| 国产精品一区第二页在线| 日韩高清在线观看视频一区| 成人限制大尺度在线观看| 国产精品高清一区二区三区不卡| 99精品国产在热app| 熟妇人妻中文av无码| 亚洲中文字幕在线第一区| 无码人妻线视频| 久久久久久久无码高潮| 久久久久久精品国产亚洲一| 2021全国产精品网站| 久久av午夜一区二区三区| 亚洲性爱区免费视频一区| 国产精品国产三级国产在线| 亚洲综合五月天在线观看| 国产末成年毛片AⅤ在线| 久久久久精品香蕉免费看| 国产成人无码a区在线观看导航| 夫妻激情视频一区二区三区| 久久不见久久见免费影院| 亚洲区在线播放| 成人国产av精品免费网| 老牛嫩草一区二区三区| 久久热这里只有精品66| 久久久国产精品无码3区| 亚洲精品无码乱码成人| 91久久精品专区一区二区 | 日韩电影久久久久dvd| 亚洲一区二区三区无码久久| 亚洲综合久久无码色噜噜| 国产自产妇一区二区三区|